top of page
DJI_0033.JPG
IMG_4542.jpeg
Overview of Services

COMMERCIAL DEVELOPMENT

FEATURED PROJECT

IMG_7230.jpeg

Nemours Hospital Rennovation

Location: Wilmington, DE
Fire Department: Talleyville Fire Company
Assisting Organization: BPGS Construction 

Originally built in 1948, the original Nemours Hospital building was fully renovated and remodeled as an office fit-out. Protected stairwells were rotated, a fire sprinkler system was outfitted, and the floor plan was completely changed. The fire department had little to no information on the layout of the building, the location of stairwells, or what the building was used for after the renovation. 

FIRE DEPARTMENT CHALLENGES

Aged building that was completely gutted, renovated, and remodeled

New location of stairwells, sprinkler controls, and hallways

Unknown location of utility controls, air handlers, and crawl spaces

OUR SOLUTIONS

Screenshot 2025-02-06 at 4.06.09 PM.png

Identify utility controls, elevator numbers, protected stairwells, and the fire dept. connection

Screenshot 2025-02-06 at 4.05.41 PM.png

Identify sprinkler controls for each floor, as well as the stairwells and standpipes.

Screenshot 2025-02-06 at 4.12.05 PM.png

Update the floor plans of the building to reflect hallways, stairwells, office numbers, exterior doors, and fire doors.

Residential Fire 2

Get in Contact with Our Team

Our team consists of 4 active Firefighters and will work 1-on-1 with your leadership in any mapping or pre-incident planning solutions you are looking for.

Aniline Vintage Logo

© 2025 by Aniline Emergency Response Resources LLC

bottom of page