top of page
Com Dev Demo 3.jpg
Engine Bay 2

COMMERCIAL DEVELOPMENT

STRUCTURAL PRE-PLAN
PROGRAM

FuseBase File 5.jpg

Sponsor a
Pre-Incident Plan for your local Emergency Services

If you have received a proposal for your local fire department, follow the link above.

Front Seat Graphic.png
Overview of Services
OVERVIEW OF SERVICES

EMERGENCY UNITS ARE DISPATCHED TO A FIRE AT YOUR  HIGH-HAZARD PROPERTY.

fIre_bell_graphic.png

In a large or complicated building, the emergency services may have challenges operating within the occupancy.

A 911 caller is reporting a fire in apartment 247, reporting that they are trapped in the bedroom.

Symbol 3.png

Upon finding the apartment, a sprinkler head has activated and is flooding the building, and now must walk around the building to find the sprinkler controls.

Symbol 2.png

Without a pre-incident plan to reference, the fire department is unable to locate the reported fire apartment before they arrive.

Symbol 4.png

The fire department locates a stairwell, but are unable to locate a hose connection to extinguish the remaining fire.

DSC_3612.jpg

WHERE IS THE FIRE INSIDE THE BUILDING?

WHERE ARE THE SPRINKLER CONTROLS?

WHAT IS STORED IN THE BUILDING?

ARE THERE ANY
STAIRWELLS?

WHAT IS BEST WAY FOR US TO ACCESS THE BUILDING?

ARE THERE ANY HAZARDOUS MATERIALS?

ARE THERE ANY SMOKE FANS WE CAN USE?

WHAT IS THE BUILDING CONSTRUCTION TYPE?

IS THERE A BASEMENT IN THE BUILDING?

WHERE ARE THE HOSE CONNECTIONS?

DOES YOUR LOCAL FIRE DEPARTMENT HAVE
THE VITAL INFORMATION REQUIRED TO PRESERVE LIFE AND PROPERTY?

FuseBase File 5.jpg

First Responders have Mobile Data Terminals that support quick and efficient access to critical information.

Our pre-incident plans are uploaded to the county 911 system for reference.

Screenshot 2025-11-19 at 9.50.23 PM.png
Our Process
OUR PROCESS

You have critical assets and information that would support an emergency response to your high-hazard property. 

LIFE SAFETY FLOOR PLANS

FIRE PROTECTION PLANS

FIRE HYDRANT FLOW
DATA

EVACUATION PLANS

HVAC INFORMATION

BUILDING CONSTRUCTION RECORDS

IMG_0245.jpeg

Our team works with developers, engineers, and property owners to ensure the fire department has the information they need when responding to new occupancies in their district.

warehouse-base-plan.png
warehouse-base-plan.png
warehouse-base-plan.png
SPP Warehouse Demo - Feb25.jpg
STEP 1

We take life safety plans, plan packages, and
as-built plans and convert them into the 911 format for fire department
pre-incident plans. 

STEP 2

Our representative meets with your project leadership to walk through the occupancy to aggregate vital information and imagery.

STEP 3

Floor plan and walk-through information is aggregated into a final pre-incident plan, which is provided to the fire department to review and approve.

DSC_4101.jpg
Recent Projects
OUR PORTFOLIO
DJI_0468.JPG

Kennett Square Apartments

Location: Kennett Square, PA
Fire Department: Kennett Regional Fire Department
Assisting Organization: Harkins Builders

A five-story type 5 wood frame multi-residential building in Kennett Square, PA. Our team visited the occupancy twice during the construction of the building and published a pre-incident plan a few months before the building was completed.
The fire chief approached our team and requested our assistance in the development of a pre-plan for this new hazard. 


 

DJI_0033.JPG

Nemours Hospital Renovation

Location: Wilmington, DE
Fire Department: Talleyville Fire Company
Assisting Organization: BPGS Construction 

Originally built in 1948, the original Nemours Hospital building was fully renovated and remodeled as an office fit-out. Protected stairwells were rotated, a fire sprinkler system was outfitted, and the floor plan was completely changed.The fire department had little to no information on the layout of the building, the location of stairwells, or what the building was used for after the renovation. 

 
 

DJI_0996.JPG

Nemours Hospital

Location: Wilmington, DE
Fire Department: Talleyville Fire Company
Assisting Organization: BPGS Construction 

Originally built in 1948, the original Nemours Hospital building was fully renovated and remodeled as an office fit-out. Protected stairwells were rotated, a fire sprinkler system was outfitted, and the floor plan was completely changed.The fire department had little to no information on the layout of the building, the location of stairwells, or what the building was used for after the renovation. 

 
 

DJI_0194.JPG

The Methodist Country House

Location: Wilmington, DE
Fire Department: Talleyville Fire Company
Assisting Organization: Whiting-Turner

The Methodist Country House is a sprawling senior living retirement community that underwent a massive renovation to expand the amount of housing, entertainment, and dining features. The fire department had difficulty navigating the community and understanding the associated fire protection systems. 

 

DSC_2456.jpg

Agile Cold Storage Warehouse

Location: Claymont, DE
Fire Department: Claymont Fire Company
Assisting Organization: Industrial Building Group

One of the first cold storage facilities in the area, the Agile Cold Storage facility was a new type of occupancy to the fire department, providing responders with unique challenges they could encounter during an emergency response. 

 

DSC_9806_edited_edited.jpg

Get in Contact with Our Team

Our entire team consists of first responders and will work 1-on-1 with your leadership in any mapping or pre-incident planning solutions you are looking for.

Aniline Vintage Logo 1 WEB transparent 7

Located in Claymont, Delaware

© 2025 by Aniline Emergency Response Resources LLC

bottom of page