top of page
DJI_0996.JPG
Engine Bay 2

MEDICAL CENTER

WILMINGTON, DE

The most innovative medical center pre-plan
in the country.

Our team developed a structural pre-plan for a 1.5 million-square-foot
level 1 pediatric hospital in Northern Delaware.

Floor plans labeled with sprinkler controls, standpipes, room numbers, gas lines, MRI zones, HVAC units, etc.

Exterior and interior imagery to assist in firefighter learning and training reference. 

Fire alarm zones, building sections, suite identifiers, and HVAC system zones to assist in locating incidents. 

Training on the application of the pre-plan for all departments on a box alarm.

DSC_3559.jpg

Our team partnered with Nemours and Talleyville Fire Company to produce a pre-plan for the 1.5 million square foot hospital.

Over the course of 3 weeks, we worked with their emergency management and facilities representatives to conduct three 6-hour walk-throughs of the hospital. 
Information was aggregated from life safety and mechanical floor plans and formatted by our team.

DSC_3313 2.jpg
Engine Bay 2

ON MAY 17TH AT 5AM, FIRE UNITS WERE DISPATCHED TO A FIRE IN THE MEDICAL CENTER

fIre_bell_graphic.png
IMG_3077.PNG
IMG_3077.PNG
Screenshot 2025-07-18 at 7.32.37 AM.png

A FIRE WAS REPORTED IN THE 3 DELTA SECTION OF THE HOSPITAL, LEAVING FIRE UNITS MAKING EDUCATED GUESSES AS TO WHERE THAT WAS WITHIN THE MEDICAL CENTER

THE LACK OF INFORMATION AVAILABLE TO FIRST RESPONDERS CAUSED A DEFICIENCY IN RESPONSE

A DELAYED CONTROL OF THE FIRE SPRINKLER SYSTEM
OF ALMOST 45 MINUTES, CAUSING HUNDREDS OF GALLONS OF EXESSIVE WATER FLOW

NO KNOWN LOCATION OF HOSE CONNECTIONS, PREVENTING CREWS FROM CONNECTION HIGH RISE RACKS

NO ACCOUNTABILITY OF CREW'S LOCATION OR SEARCHES COMPLETED

Screenshot 2025-07-18 at 7.36.26 AM.png
Engine Bay 1

Pre-Plan Features

SPP - Nemours Hospital 2.jpg

Identification of each hospital wing and the FDC that services that wing.

Screenshot 2025-01-26 at 12.28.59 PM.png

MRI Zones highlighted, enhancing first responder safety and supporting incident locating.

Screenshot 2025-01-26 at 12.31.04 PM.png

Sprinkler control locations, haz-mat cabinets, electric vehicle chargers, and metal roll-up doors.

Screenshot 2025-01-26 at 12.32.08 PM.png

Entrance identifications and FDCs with the area the connection supports.

Screenshot 2025-01-26 at 12.33.55 PM.png

Door numbers, protected stairwells, elevators, elevator machine rooms, and mechanical rooms.

SPP - Nemours Hospital 14.jpg

Visual representation of fire alarm and fire sprinkler system zones on each division.

Screenshot 2025-01-26 at 12.36.59 PM.png

Text representations and overview of the building for quick and effective information access. 

SPP - Nemours Hospital 35.jpg

Interior and exterior imagery of the entire structure, supporting firefighter learning and training. 

DSC_3690.jpg
Residential Fire 2

Training Events

Our team provided training on the organization and application of the pre-plan for the fire departments that are on box alarm responses. Additionally, our team completed training for all four career shifts.  

Residential Fire 2

Get in Contact with Our Team

Our team consists of 4 active Firefighters and will work 1-on-1 with your leadership in any mapping or pre-incident planning solutions you are looking for.

Aniline Vintage Logo

© 2025 by Aniline Emergency Response Resources LLC

bottom of page