_20220211_cpub_incyte_building.jpg
Incyte_logo.svg.png

A PRE-PLAN FOR THE GLOBAL INCYTE BIOPHARMACEUTICAL HEADQUARTERS

IN WILMINGTON, DE

100% FREE FOR THE FIRE COMPANY
FUNDED BY THE PROPERTY OWNER

DETERMINED AND ILLUSTRATED

THE LOCATION OF:

- All rooms/offices

- Fire hydrants

- The correct FDC for each building section
- Closest door/stairwell
- Closest standpipe 
- Roof access points
- Radioactive equipment 
- The incident command center

THE PRE-PLAN

DEFINES:

- The importance of the command center
- The use of the smoke ejection system
- The zones that coordinate with the smoke ejection system
- The hazardous materials within the loading dock
- Door numbers in relation to stairwells
- The address associated with the site
- The A, B, C and D sides
IncyteCAD

ACCESSIBLE BY ANY RESPONDING UNIT